1 London Water Ring Main
Stages 2. 1-B and 5, together with other smaller sections.
Stakeholder – Thames Water Utilities
Clients (Main Contractors) – J Murphy and Sons Ltd and Miller Civil Engineering (now Morgan Sindall)
Stakeholder – Thames Water Utilities
Clients (Main Contractors) – J Murphy and Sons Ltd and Miller Civil Engineering (now Morgan Sindall)
2 Millennium Dome Cable Tunnel
Stakeholder – Thames Water Utilities
Clients (Main Contractors) – J. Murphy and Sons Ltd and Miller Civil Engineering
Clients (Main Contractors) – J. Murphy and Sons Ltd and Miller Civil Engineering
3 City of London Cable Tunnel
Stakeholder – EDF Energy (now UK Power Networks).
Clients (Main Contractors) – J Murphy and Sons Ltd.
Clients (Main Contractors) – J Murphy and Sons Ltd.
4 St John’s Wood to Elstree Cable Tunnel
Stakeholder – National Grid
Clients (Main Contractors) – J Murphy and Sons Ltd.
Clients (Main Contractors) – J Murphy and Sons Ltd.
5 Channel Tunnel Rail Link: Phase 1 – Kent
CTRL 350 and 410 – North Downs Tunnel and Medway Bridge.
Stakeholder – Rail Link Engineering
Clients (Main Contractors) – Miller, Vinci, Beton und Monierbau (now BeMo Tunnelling)
Stakeholder – Rail Link Engineering
Clients (Main Contractors) – Miller, Vinci, Beton und Monierbau (now BeMo Tunnelling)
6 Channel Tunnel Rail Link: Phase 2 – London
CTRL 316, 310 and 320 – Thames Tunnels, over ground viaducts and utility works.
Stakeholder – Rail Link Engineering
Clients (Main Contractors) – Murphy, Hochtief, Miller and Vinci
Stakeholder – Rail Link Engineering
Clients (Main Contractors) – Murphy, Hochtief, Miller and Vinci
7 King Cross Station
Passenger access upgrade works
Stakeholder – Transport for London.
Clients (Main Contractors) – Miller and Beton und Monierbau (now BeMo Tunnelling)
Stakeholder – Transport for London.
Clients (Main Contractors) – Miller and Beton und Monierbau (now BeMo Tunnelling)
8 Limerick Main Drainage
Stakeholder – Limerick Corporation
Clients (Main Contractors) – J Murphy and Sons Ltd.
Clients (Main Contractors) – J Murphy and Sons Ltd.
09 Croydon Cable Tunnel
Stakeholder – National Grid
Clients (Main Contractors) – Miller Civil Engineering (now Morgan Sindall).
Clients (Main Contractors) – Miller Civil Engineering (now Morgan Sindall).
10 Lower Lea Valley Cable Tunnels
Stakeholder – London Development Authority (latterly the Olympic Delivery Authority).
Clients (Main Contractors) – J Murphy and Sons Ltd.
Clients (Main Contractors) – J Murphy and Sons Ltd.
11 Lee Tunnel Beckton
Becton to Abbey Mills
Stakeholder – Thames Water
Clients (Main Contractors) – Morgan Sindall, Vinci
Stakeholder – Thames Water
Clients (Main Contractors) – Morgan Sindall, Vinci
12 Crossrail
C510. Read about this contract on the Crossrail site
Stakeholder – Transport for London
Client BBMV (Balfour Beatty Morgan Sindall Vinci Construction)
Stakeholder – Transport for London
Client BBMV (Balfour Beatty Morgan Sindall Vinci Construction)
13 Victoria Station Upgrade (VSU)
Stakeholder – LUL
Clients (Main Contractors) – Taylor Woodrow Bam Nutall
Clients (Main Contractors) – Taylor Woodrow Bam Nutall
14 Crossrail
C300 – C410 Farringdon, Bond St, Tottenham Court Rd, Fisher St
Stakeholder – Transport for London
Client – Bam Nutall
Stakeholder – Transport for London
Client – Bam Nutall